| 1993 | 2 | 5 tonne capacity and 85 tonnes/hour Ropeways at Ranjit Sagar Dam Project, Pathankot. |
| 1995 | 1 | 1 tonne bucket capacity, 2 tons hook load, 400 mtrs long Cable Crane in Himachal. |
| 1997 | 1 | Major components for a 13 km long Mono-cable Ropeway for M/s Diamond Cements. |
| 2001 | 1 | 500 mtrs long Ropeway for HPSEB Kafnoo (HP). |
| 2002 | 1 | 2 tonne hook load/4 passenger cum material Ropeway for Hanuman Ganga Project in Uttarakhand. |
| 2003 | 1 | 2 tonne payload, 600 mtrs long Ropeway in Samot, Distt. Chamba (HP). |
| 2005 | 1 | 1.5 km long, 2 tons hook load, material cum passenger Ropeway for Regency Aquaelectro and Motel Resorts Ltd. In Manali (H.P) |
| 2005 | 1 | 1.5 Mt bucket load, 600 mtr. long Material Ropeway for Lanco Infratech Ltd Dharamshala. |
| 2005 | 1 | 1.5 Mt bucket load, 950 mtrs long material Ropeway for Lanco Infratech Ltd. |
| 2005 | 1 | 1.5 Mt bucket load, 750 mtr. long material Ropeway for Lanco Infratech Ltd Dharamshala. |
| 2006 | 1 | 2000 Kgs. hook load, material Ropeway for Astha Hydro Projects (India) Ltd. Palampur (H.P.) |
| 2007 | 1 | 2 Mt bucket load, 350 mtrs long for AT Hydro (Chamba) |
| 2007 | 1 | 2 Mt bucket load, 550 mtrs long material Ropeway for Tejas Sarnika Hydro Energies (P) Ltd. Terella (Chamba) H.P. |
| 2007 | 1 | 2 Mt. bucket load, 700 mtrs long Cargo Ropeway for Anubhav Hydel Power (P) Ltd, Palampur |
| 2008 | 1 | 2 Mt. 500 Mtr. Long Motorized ropeway for Regent Hydro (P) Ltd. Kinnaur (H.P.) |
| 2008 | 1 | 2 Mt. gravity Ropeway for Lanco Infratech (Budhil) H.P. |
| 2008 | 1 | Up-gradation of 1500 mtrs long cargo Ropeway from 2 Mt. to 4 Mt. for Regency Aqua-electro & Motel Resorts. |
| 2008 | 1 | 200 mtrs long river-crossing cargo/passenger Ropeway for Sorang HEP (H.P.) |
| 2009 | 1 | Maintenance of 3 tonne cargo Ropeway at Kinnaur (H.P.) |
| 2010 | 1 | 5 Mt. hook load capacity cargo Ropeway for Maytas-NCCSSJV in Kinnaur, H.P. |
| 2012 | 1 | 10 Mt. Cable Crane for laying penstock pipes for 100 MW Sorang Hydro Power Project (NCC Infrastructures) in Kinnaur, H.P. |
| 2013 | 2 | 4 Mt. cargo Ropeway at an inclination of 45 degrees for Kut Hydro, Kinnaur, H.P. |
| 2017 | 1 | 300 mtrs long Ropeway for Rock-fall protection, Nepal. |
| 2021 | 1 | 5 ton Cable Crane for Nilgiri Hydro, Nepal. |
| 2021 | 2 | 3.5 tons and 2.5 tons Cable Cranes for Makari Gad Hydro, Nepal. |
| 2023 | 1 | 1600 mtrs long Ropeway of 1.5 tons capacity for Lipping Hydro, Nepal. |