UNDER EXECUTION

List of installations under execution

QTY DESCRIPTION
1 1200 mtrs long material cum passenger Ropeway for 113 Engineers Regiment, Sikkim.
1 1600 mtrs long Ropeway with Payload of 3 tons for Rolwaling Hydro, Nepal.
1 1500 meters long, 3000 kg/hour capacity Ropeway for a Tea Estate in Africa
1 Repair, Manufacture of critical components and Re-installation of a 10 ton capacity Cable Crane for Megha Engineering at Barot Valley, H.P.
1 500 meters long, Monocable Jig-Back for Horticulture Transportation in Uttarakhand for Agriculture Marketing Board.
2 3 km long Mono Cable Ropeway with an hourly capacity of 3000 kg for a Tea Estate in Rwanda, Africa
1 5-ton capacity, 750-meter long Cable Crane for the construction of a Passenger-Carrying-Ropeway by Usha Breco Limited at Pavagadh, Gujarat.
1 3.5 tons capacity, 750 meters long Cable Crane for Jurimba Khola Hydropower Project, Nepal.